Detail photos

Trailer

The batching plant ís assembled on a common 2-axle, 13.6 M step frame semi trailer in a welded steel frame.

Transport

The belt conveyor can be packed up and transported on top of the batching plant. Transportation may only take place with empty hoppers and an empty water tank.

Pan mixer

Pan mixer in steel with an internal lining of replaceable, sectioned wearing plates and Hardox steel-plate bottom and enclosure. Equipped with a gear motor for optimised effect, automatic radial opening, inlet for cement auger and inspection hatches.

Load cells

The pan mixer is placed on three 5000 kg electronic load cells with an accuracy of +/- 0.5 %.

Hoppers

Two integrated twin hoppers for 2 x 2 types of aggregate. Each hopper holds 2 x 2.4 M³. Made in all-welded steel plate with reinforced corners. 2 x 2 separate feed belts for dosing of aggregates.

Pre-weighing cement silo

Integrated silo with auger for pre-weighing of cement. The silo is placed on three 2000 kg electronic load cells with an accuracy of +/- 1 %.

Flowmeter

Parallel dosing of water and aggregates for reduced cycle time and pan mixer wear and reduced energy consumption.

Operating system with thermal printer

Placed in the cabin for operation supervision. Possibility of manual, semi-automatic and automatic operation and PC interface. No previous knowledge required and can be delivered with the language version desired. Stores 60 recipes. Dosing accuracy: +/- 0,5-2 %

Equipment

The standard T2200 is delivered with two additive pumps, high-pressure cleaner og air compressor.

Return on investment

Our machines and equipment have a very short pay back period. Let us calculate your return on investment – For free.

Open chat